Tuesday, 10 April 2007

wow, so fast the first week of reno over liao and we are going into Day 8 went with HB to our nest to check on the progress of reno again. i beri kan cheong spider one, everyday muz go down and check the reno progress (except sun).

the kitchen floor tiles oni laid halfway but service yard tiles are done (except skirting), tot supposed to be completed today? windows for our balcony n service yard have been installed, which is according to the reno schedule.

something ahead of schedule is the ceiling works, supposed to be done oni on tis wed. but the LBox for living room is up liao and dining area 25% done. both with no holes for the downlight yet. 2 workers were working on the box-up wall for my MBR and also the box-up for the ugly aircon trunking.

all was well until one of the worker (the foreman) said there is a problem with the box-up for the aircon trunking in my MBR and bedroom 1. the aircon guy had install the aircon component (without the fancoil) at the area which should be boxed up so now we need to leave a 3ft space for the fancoil, tis means 3ft of exposed ugly trunking the final product better turn out nice lor, otherwise i'll go crazy.

aluminium casement window with clear glass, LBox completed in living room
Photo Sharing and Video Hosting at Photobucket
LBox in dining room 25% done
Photo Sharing and Video Hosting at Photobucket
our study room, the tiles at the hacked area has been laid. see the white line, dats where the tempered glass wall supposed to be at.
Photo Sharing and Video Hosting at Photobucket
kitchen floor tiles half done
Photo Sharing and Video Hosting at Photobucket
service yard floor all done except for the skirting
Photo Sharing and Video Hosting at Photobucket

Written @ 13:16





Site-mistress
Name: Mrs. Kow aka Bluberi
Age: Going on 26
Horoscope: can be Taurus or Gemini
Email: blu_pinkuberi@yahoo.com.sg
Bold Underline Strikeout
My Loves
Darling Hubby
Family
Friends
Sleeping
Reading
Shopping!
Singing KTV
My Wishlist
* Reno common & MBR toilets
* Change balcony sliding door
* Re-do MBR wardrobe doors
* Get a dryer
* New vacumn cleaner
* Re-do HHS feature wall
* New set of curtains
* New bedsheet + quilt cover set
Way Out
My Bloggie ♥
My Wedding Bloggie ♥
Renotalk Forum ♥
Melodies

Paste music code here.
Get your music code at
imeem or iwebmusic
The Memories
December 2006
January 2007
February 2007
March 2007
April 2007
May 2007
June 2007
July 2007
August 2007
November 2007
February 2008
March 2008
Many Thanks
Designer: %BLUE.pink-
Basecodes: %MOOOx-LOVE
Inspirations: x-taintedlove
Materials: Lovecandied
Others: Blogskins, Photobucket
Skin layout edited with Paint program