after waiting for abt 2mths, we finally started our reno today. went down to my nest after my exams tis afternoon. tot by the time i reached at 5.45pm, the workers would have left. but i saw my unit's door n gate was opened widely, which means still got workers inside.when i stopped at my doorstep, i oni heard voices. when i went inside, saw two bangladeshis toking to each other n putting corrugated boards onto the floor. how come is bangladeshis ar, i tot my ID said his workers are malaysians? muz tell my HB to ask ID tml liao. was pleased to see that the study room wall has been hacked liao... BUT... i got a shocked when i saw dat the wall was hacked all the way until under the living room beam which was not supposed to be lor. also found two long cracks in the bedroom next to the study and on the wall outside the study. the hacking muz have made BIG impact on the walls. called ID who said he'll tell his workers to rectify the problems. they better do a nice job, otherwise i'll @#$%!& to my ID.btw, never see the tiles that my ID supposed to help mi pick up from Hafary. hmm, maybe he'll pick up oni when the workers need the tiles ba...
my kitchen floor tiles. simply love them
the reno permit and notice from ID
the cement in my kitchen
view of living room from door. corrugated boards on the floor
study room walls are hacked
see the red box, this part of the wall was not supposed to be hacked!!
view of dining area from the study room
crack found on wall outside the study room
Bedroom 3 with corrugated board

cracked found in Bedroom 3 wall from the impact of hacking

close up shoot of crack in Bedroom 3
Bedroom 2 with corrugated board
MBR with corrugated board